The photos above show St. Paul’s Episcopal Church after its renovation.
If Congress has taught us anything, it’s that coming to a consensus isn’t always easy.
The congregation at St. Paul’s Episcopal Church in the heart of Baltimore can empathize. When it came to deciding how to refresh the outdated baby blue paint scheme on the sanctuary’s ceiling, there was a lot of discussion.
Ten years’ worth of discussion, in fact.
Affectionately known as Old St. Paul’s, the parish was founded in 1692 as a mission church of the Diocese of London; it moved to its present location in Baltimore in 1729, and the current church building was constructed in 1856.
While there have been renovations over the years – especially around the early 1900s and in the ’50s and ’60s – members of the congregation wanted to ensure any changes to the ceiling and the other interior surfaces respected the historical integrity of the building.
“There were a lot of different views on what the right thing to do was with a church of this history and architectural significance,” said Lauren Myatt, principal at Murphy & Dittenhafer Architects, which took on the project more than three years ago.
Preserving historical integrity
Selecting a paint scheme was no small undertaking.
The team from Murphy & Dittenhafer started by conducting a thorough historical analysis of the building. A specialist took samples of paint from different eras of the building, which were used to create a design that married the paint schemes from the 1850s and the turn of the century.
Their research also found it was popular in the mid-1800s for churches to have stars on their ceilings – including other churches designed by the original architect Richard Upjohn. While they were not able to pinpoint exact evidence of stars on the ceilings of Old St. Paul’s, the team at Murphy & Dittenhafer and the Church endorsed the concept of executing what appeared to be Upjohn’s original design intentions for the ceiling of Old St. Paul’s.
Working with a small design committee from the church, as well as interacting with members of the congregation through focus groups, Myatt and her colleagues fleshed out a scheme: Santa Monica blue, very similar to the original 1856 wood ceiling color, dotted with new gold stars of several sizes arranged in a random type pattern, which members of the congregation could purchase for their loved ones.
The space would be further enhanced with new energy-efficient task and accent lighting.
Once the congregation signed off on M&D’s proposed design, it was time to get down to business. Or, rather, up to business.
Painting the 60-foot-high ceilings required the installation of an elaborate scaffolding system with a “dance” floor almost at the height of the ceiling to give workers access to their canvas – a complicated effort that M&D’s Myatt coordinated with the painting and lighting construction scope.
Work began in late May 2013 and was completed in early September of that year to take advantage of the church’s slower summer months.
A renewed interest in church
After a decade of indecision, feedback from the congregation has been positive, Myatt said. The church has seen an increase in the number of people interested in getting married in the sanctuary and is finding the need to repurpose underused spaces to accommodate additional congregants.
In fact, Old St. Paul’s is currently working with Murphy & Dittenhafer to complete more renovations.
Since April, the firm has been reconfiguring and renovating the back of the sanctuary to provide more space for fellowship in addition to repurposing space in the lower level of the church to be used for religious education.
And, just as with the ceiling project, the church’s storied past is top of mind.
“We are doing things that are sensitive to historic character – particularly as it relates to the sanctuary space,” Myatt said. “We’re selecting finishes that are appropriate to the history and age of the building but are also durable materials and have the right aesthetic.”
The goal is to work with the church’s character, while also balancing the current needs of the congregation and the current ways the building is being used.
Improve the experience, incorporate functionality
To improve retention at the end of services, the last four rows of pews are being removed to create a larger area for congregants to gather. In researching how to approach flooring in this area, Myatt’s team found the church originally used Minton tile produced in England. They’ve decided to incorporate the Minton tile in a border along with a complementing, more cost-effective waxed quarry tile.
“The cost is not small when you’re talking about really specialized items like that,” Myatt said. “We worked very hard to find a tile floor finish that worked very nicely with historic Minton tile.”
Increased interest in the church, has led to the need for additional classroom space. The team from Murphy & Dittenhafer Architects is taking a less historic approach to the new classroom space – creating a room that’s colorful, warm and inviting for children, while also replacing single-paned windows with more energy efficient storefront windows and installing a new HVAC system to make the area comfortable year-round.
They expect to wrap up work on the new classroom and sanctuary gathering space by the end of September. But that won’t spell the end of Murphy & Dittenhafer Architects’ work with Old St. Paul’s. The firm is drawing up plans to build an ADA-compliant exterior ramp and will complete renovations to the church’s rectory, which was constructed in 1791.
And, as with all the work they’ve done in the church so far, history will never be far from mind.
Myatt, for one, is happy to peel back the church’s rich roots, while helping tell the story of its future.
Stay updated by liking us on Facebook!
At Murphy & Dittenhafer Architects, mentorship isn’t just a professional courtesy, but a cornerstone of the firm’s culture. Harper Kvasnovsky, Senior Associate at M&D, embodies that spirit wholeheartedly.
When breathing new life into a historic landmark, we prioritize a design philosophy that bridges past and present.
Murphy & Dittenhafer Architects has been working on a range of projects for Baltimore County’s first responder community, which require a unique Architectural design approach.
To round out our 40th-year celebrations, enjoy 10 more impactful and diverse Architecture projects designed by M&D. These projects, most of which have received design awards, confirm the variety in design (from scale to usage) that we continue to be involved in today.
Murphy & Dittenhafer Architects is working hard and collaborating with the community on an urban planning study for South George Street in York City.
“Historic preservation has always been a hallmark of ours for our 40-year history,” says M&D President Frank Dittenhafer II. These 10 projects exemplify our passion for this work.
It’s the 40th year of Murphy & Dittenhafer Architects, so Frank Dittenhafer II, President, is taking the time to highlight some of our most influential projects over the decades.
We’re celebrating 40 years of influence in Pennsylvania and Maryland. With that, we couldn’t help but reflect on some of the most impactful projects from our history.
Harford Community College’s expanded new construction Chesapeake Welcome Center is a lesson in Architectural identity
At Murphy & Dittenhafer Architects, we feel lucky to have such awesome employees who create meaningful and impressive work. Meet the four team members we welcomed in 2024.
The ribbon-cutting ceremony at the new Department of Legislative Services (DLS) office building in Annapolis honored a truly iconic point in time for the state of Maryland.
As Murphy & Dittenhafer architects approaches 25 years in our building, we can’t help but look at how far the space has come.
Murphy & Dittenhafer Architects took on the Architecture, Interior Design, & Overall Project Management for the new Bedford Elementary School, and the outcome is impactful.
The memorial’s groundbreaking took place in June, and the dedication is set to take place on November 11, 2024, or Veterans Day.
President of Murphy & Dittenhafer Architects, Frank Dittenhafer II, spoke about the company’s contribution to York-area revitalization at the Pennsylvania Downtown Center’s Premier Revitalization Conference in June 2024. Here are the highlights.
The Pullo Center welcomed a range of student musicians in its 1,016-seat theater with full production capabilities.
“Interior designs being integral from the beginning of a project capitalize on things that make it special in the long run.”
Digital animations help Murphy & Dittenhafer Architects and clients see designs in a new light.
Frank Dittenhafer and his firm work alongside the nonprofit to fulfill the local landscape from various perspectives.
From Farquhar Park to south of the Codorus Creek, Murphy & Dittenhafer Architects help revamp York’s Penn Street.
Designs for LaVale Library, Intergenerational Center, and Beth Tfiloh Sanctuary show the value of third places.
The Annapolis Department of Legislative Services Building is under construction, reflecting the state capital’s Georgian aesthetic with modern amenities.
For the past two years, the co-founder and president of Murphy & Dittenhafer Architects has led the university’s College of Arts and Architecture Alumni Society.
The firm recently worked with St. Vincent de Paul of Baltimore to renovate an old elementary school for a Head Start pre-k program.
Murphy & Dittenhafer Architects is celebrating a season of new beginnings with ribbon cuttings for community-based projects across Pennsylvania and Maryland, and it’s not over yet.